TSMC

The foundry that manufactures most leading-edge AI chips, and the builder of the Arizona fab cluster.

5 timelines · 45 dated entries · last update Oct 22, 2026 · JSON

Wikipediatsmc.com

Role in each timeline

TSMC across every timeline

Every dated entry that names TSMC, from all 5 timelines, newest first. Earlier years show only dates and titles; click a year to show the details.

202619 entries
20257 entries
  1. Jul 17, 2025Second fab construction complete, production pulled forward; 30% of 2nm-and-beyond capacity to be in Arizona
  2. Apr 29, 2025TSMC breaks ground on its third Arizona fab, slated for N2 and A16
  3. Apr 17, 2025TSMC assigns N2 and A16 to its third and fourth Arizona fabs
  4. Apr 17, 2025TSMC says second Arizona fab construction is complete
  5. Apr 14, 2025AMD validates fifth-generation EPYC products at TSMC Arizona fab
  6. Apr 14, 2025NVIDIA says Blackwell chips start production at TSMC Phoenix plants
  7. Mar 4, 2025TSMC adds US$100 billion for three more fabs, two packaging plants and an R&D center: US$165 billion total
202411 entries
  1. Dec 2024First Arizona fab enters volume production on N4
  2. Nov 15, 2024Commerce says Arizona Fab 1 yields are on par with Taiwan
  3. Nov 15, 2024Commerce finalizes up to US$6.6 billion CHIPS award for TSMC Arizona
  4. Oct 23, 2024Report says Phoenix fab yield exceeds comparable Taiwan fabs
  5. Aug 13, 2024TSMC authorizes up to US$7.5 billion for TSMC Arizona
  6. Aug 5, 2024Blackwell shipments reported delayed to early 2025; Nvidia says production is on track
  7. Apr 8, 2024Up to US$6.6 billion in CHIPS Act funding; third fab planned; second fab moves to 2nm and 2028
  8. Apr 2024First Arizona fab enters N4 engineering-wafer production
  9. Mar 18, 2024Blackwell platform announced at GTC 2024 with B200 and GB200
  10. Feb 6, 2024TSMC authorizes up to US$5 billion for TSMC Arizona
  11. Jan 18, 2024TSMC puts Fab 2 production planning in 2027 or 2028
20234 entries
  1. Aug 8, 2023TSMC authorizes up to US$4.5 billion for TSMC Arizona
  2. Jul 20, 2023TSMC pushes Arizona N4 production out to 2025, citing a shortage of skilled workers
  3. Feb 14, 2023TSMC authorizes up to US$3.5 billion for TSMC Arizona
  4. Jan 12, 2023TSMC says US fab construction costs can be four to five times Taiwan's
20222 entries
  1. Dec 6, 2022Tool-in ceremony: first fab moves to N4, second fab announced for 3nm in 2026, US$40 billion total
  2. Mar 22, 2022Nvidia announces the Hopper architecture and H100 GPU at GTC 2022
20211 entry
  1. Jun 1, 2021TSMC begins construction at its Arizona fab site
20201 entry
  1. May 15, 2020TSMC announces a US$12 billion 5nm fab in Arizona