{
  "data_version": "1",
  "schema": "https://whatledto.com/data",
  "slug": "tsmc-arizona-fabs",
  "title": "TSMC Arizona: From a $12 Billion Fab to a $265 Billion Gigafab Cluster",
  "url": "https://whatledto.com/events/tsmc-arizona-fabs",
  "markdown": "https://whatledto.com/events/tsmc-arizona-fabs.md",
  "feed": "https://whatledto.com/events/tsmc-arizona-fabs/feed.xml",
  "vertical": "tech-industry",
  "topic": "Tech industry",
  "status": "live",
  "tags": [
    {
      "slug": "semiconductor-manufacturing",
      "name": "Semiconductor manufacturing",
      "url": "https://whatledto.com/tags/semiconductor-manufacturing"
    },
    {
      "slug": "tsmc",
      "name": "TSMC",
      "url": "https://whatledto.com/tags/tsmc"
    },
    {
      "slug": "us-industrial-policy",
      "name": "US industrial policy",
      "url": "https://whatledto.com/tags/us-industrial-policy"
    }
  ],
  "created_at": "2026-09-02T09:41:03.023496+00:00",
  "updated_at": "2026-09-09T06:06:11.421481+00:00",
  "last_researched_at": "2026-09-08T02:43:24.353028+00:00",
  "tldr": "TSMC’s Arizona project began in 2020 as a planned US$12 billion, 5nm fab with production targeted for 2024. The first fab shifted to N4, was delayed to 2025 because of a shortage of skilled equipment-installation workers, and entered volume production in late 2024; customers including NVIDIA, AMD and Apple have since cited Arizona-made chips or products. Federal CHIPS Act support and successive expansion plans have turned the Phoenix site into a proposed US$265 billion cluster of fabs, packaging facilities and R&D, with Fab 2 complete, Fab 3 topped out, and initial work started on Fab 4 and a packaging plant. The main uncertainty is timing and final process assignments for the later fabs: TSMC has repeatedly pulled schedules forward or revised node plans, while its newest US$100 billion expansion has no firm schedule.",
  "hero_image": "https://images.unsplash.com/photo-1551952284-47086cd96da5?ixid=M3w5OTg1Nzd8MHwxfGFsbHx8fHx8fHx8fDE3ODgzNTEzMjB8&ixlib=rb-4.1.0&w=1600&q=80&auto=format&fit=crop",
  "hero_credit": {
    "source": "unsplash",
    "photo_id": "9tQxbON36Q0",
    "photographer": "Raivis Razgals",
    "photographer_url": "https://unsplash.com/@rraivisr?utm_source=whatledto&utm_medium=referral",
    "photo_url": "https://unsplash.com/photos/people-walking-on-road-9tQxbON36Q0?utm_source=whatledto&utm_medium=referral",
    "description": "people walking on road",
    "license": "",
    "license_url": ""
  },
  "entities": [
    {
      "name": "AMD",
      "kind": "company",
      "role": "Customer that announced validation of fifth-generation EPYC products at TSMC’s Arizona fab."
    },
    {
      "name": "Amkor",
      "kind": "company",
      "role": "Named by NVIDIA as an Arizona packaging-and-test partner."
    },
    {
      "name": "Apple",
      "kind": "company",
      "role": "Said it expected to buy well over 100 million advanced chips made at TSMC’s Arizona facility in 2026."
    },
    {
      "name": "Nvidia",
      "kind": "company",
      "role": "Customer that announced Blackwell production at TSMC’s Phoenix plants."
    },
    {
      "name": "SPIL",
      "kind": "company",
      "role": "Named by NVIDIA as an Arizona packaging-and-test partner."
    },
    {
      "name": "TSMC",
      "kind": "company",
      "role": "Taiwan-based chipmaker building and operating the Arizona fabs and announcing the site’s successive investment and technology plans."
    },
    {
      "name": "TSMC Arizona",
      "kind": "company",
      "role": "TSMC’s Arizona operation, recipient of CHIPS Act support and operator of the Phoenix fabrication site."
    },
    {
      "name": "Arizona",
      "kind": "other",
      "role": "US location of TSMC's fab site and Phoenix chip plants."
    },
    {
      "name": "City of Phoenix",
      "kind": "other",
      "role": "Reported local construction milestones, including the Fab 3 topping-out ceremony and initial work on Fab 4 and a packaging plant."
    },
    {
      "name": "Fab 3",
      "kind": "other",
      "role": "TSMC Arizona's third fab, which held a topping-out ceremony."
    },
    {
      "name": "Taiwan",
      "kind": "other",
      "role": "Comparison location for TSMC fab construction costs and reported chip yields."
    },
    {
      "name": "C.C. Wei",
      "kind": "person",
      "role": "TSMC chairman and CEO who has described accelerated Arizona schedules, the planned gigafab cluster and the US$265 billion investment total."
    },
    {
      "name": "Donald Trump",
      "kind": "person",
      "role": "U.S. president at the White House announcement of TSMC's March 2025 US$100 billion U.S. expansion."
    },
    {
      "name": "Howard Lutnick",
      "kind": "person",
      "role": "The Commerce secretary attended TSMC's April 2025 groundbreaking for the third Arizona fab."
    },
    {
      "name": "Joe Biden",
      "kind": "person",
      "role": "U.S. president who attended the December 2022 Arizona tool-in ceremony."
    },
    {
      "name": "Kate Gallego",
      "kind": "person",
      "role": "Phoenix mayor who participated in the Fab 3 topping-out ceremony."
    },
    {
      "name": "Mark Liu",
      "kind": "person",
      "role": "Then-TSMC chairman who said in 2023 that a shortage of skilled workers would delay Arizona N4 production."
    },
    {
      "name": "Rick Cassidy",
      "kind": "person",
      "role": "TSMC US division president cited as stating Phoenix yields exceeded comparable Taiwan facilities."
    },
    {
      "name": "Wendell Huang",
      "kind": "person",
      "role": "TSMC executive associated with the US-versus-Taiwan fab construction-cost statement."
    },
    {
      "name": "A16",
      "kind": "product",
      "role": "A TSMC advanced process assigned alongside N2 to the third Arizona fab in later plans."
    },
    {
      "name": "AMD EPYC",
      "kind": "product",
      "role": "AMD said it had brought up and validated fifth-generation EPYC CPU products at TSMC’s Arizona fab."
    },
    {
      "name": "Blackwell",
      "kind": "product",
      "role": "NVIDIA's AI-chip line that NVIDIA said was being produced at TSMC's Phoenix plants."
    },
    {
      "name": "EPYC",
      "kind": "product",
      "role": "AMD's server-CPU line, whose fifth-generation products were validated at the Arizona fab."
    },
    {
      "name": "N2",
      "kind": "product",
      "role": "TSMC’s 2nm process, assigned to later Arizona fabs as part of the site’s advanced-node expansion."
    },
    {
      "name": "N4",
      "kind": "product",
      "role": "The 4nm-class process used by the first Arizona fab, replacing its original 5nm plan; the fab entered volume production in late 2024."
    },
    {
      "name": "NVIDIA Blackwell",
      "kind": "product",
      "role": "NVIDIA said Blackwell chips had begun production at TSMC plants in Phoenix in April 2025."
    },
    {
      "name": "State of Arizona",
      "kind": "regulator",
      "role": "Provided state support for the site."
    },
    {
      "name": "U.S. Department of Commerce",
      "kind": "regulator",
      "role": "Negotiated up to US$6.6 billion in preliminary CHIPS Act funding for TSMC Arizona and has publicly supported the project."
    },
    {
      "name": "U.S. Securities and Exchange Commission",
      "kind": "regulator",
      "role": "Received TSMC’s Form 6-K disclosure of the board authorization for up to US$20 billion in capital injection to TSMC Arizona."
    },
    {
      "name": "U.S. federal government",
      "kind": "regulator",
      "role": "Federal support was part of TSMC's original 2020 Arizona announcement and later included proposed CHIPS Act funding."
    }
  ],
  "nodes": [
    {
      "id": 24,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n24",
      "date": "2020-05-15",
      "date_precision": "day",
      "title": "TSMC announces a US$12 billion 5nm fab in Arizona",
      "summary": "TSMC said it intended to build and operate an advanced fab in the United States with support from the\nfederal government and the State of Arizona: 5-nanometer technology, 20,000 wafers a month, over 1,600\njobs, about US$12 billion of spending from 2021 to 2029, construction from 2021 and production in 2024.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "State of Arizona"
      ],
      "published_at": "2026-09-02T09:41:03.026948+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://pr.tsmc.com/english/news/2033",
          "outlet": "TSMC Newsroom",
          "published": "2020-05-15",
          "quote": "Construction is planned to start in 2021 with production targeted to begin in 2024"
        }
      ]
    },
    {
      "id": 33,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n33",
      "date": "2021-06-01",
      "date_precision": "day",
      "title": "TSMC begins construction at its Arizona fab site",
      "summary": "TSMC said it had started construction at an Arizona site for a computer-chip factory. The company planned to spend US$12 billion on the facility.",
      "type": "other",
      "entities": [
        "TSMC",
        "C.C. Wei",
        "Arizona"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "The article states that TSMC had started construction at the Arizona site and planned to spend $12 billion on the chip factory. It identifies the CEO's statement as having been made on Tuesday, June 1, 2021.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://finance.yahoo.com/news/tsmc-says-construction-started-arizona-180605060.html",
          "outlet": "Reuters",
          "published": "2021-06-02",
          "quote": "TSMC has started construction at a site in Arizona where it plans to spend $12 billion to build a computer chip factory, its chief executive said on Tuesday."
        }
      ]
    },
    {
      "id": 25,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n25",
      "date": "2022-12-06",
      "date_precision": "day",
      "title": "Tool-in ceremony: first fab moves to N4, second fab announced for 3nm in 2026, US$40 billion total",
      "summary": "At the ceremony marking the arrival of manufacturing equipment, attended by President Biden, TSMC said\nthe first fab would begin N4 production in 2024 and that construction of a second fab had started, with\n3nm production scheduled for 2026. The two fabs together were put at about US$40 billion.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "Joe Biden",
        "Gina Raimondo"
      ],
      "published_at": "2026-09-02T09:41:03.027068+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://pr.tsmc.com/english/news/2977",
          "outlet": "TSMC Newsroom",
          "published": "2022-12-06",
          "quote": "TSMC has also started the construction of a second fab which is scheduled to begin production of 3nm process technology in 2026"
        }
      ]
    },
    {
      "id": 34,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n34",
      "date": "2023-01-12",
      "date_precision": "day",
      "title": "TSMC says US fab construction costs can be four to five times Taiwan's",
      "summary": "TSMC said construction costs for building and facility work could be four to five times higher for a US fab than for a fab in Taiwan. It said construction costs were a major reason for the cost gap.",
      "type": "financial",
      "entities": [
        "TSMC",
        "Wendell Huang",
        "Arizona",
        "Taiwan"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "The transcript is readable and identifies the earnings call event date as January 12, 2023. It states that building and facility construction costs are the major reason for the cost gap and can be 4 to 5 times greater for a U.S. fab than for one in Taiwan.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2023-01/84f1ef6f66c6c90b05d2e581066a01a8f1c4f410/TSMC%204Q22%20Transcript.pdf",
          "outlet": "TSMC earnings-call transcript",
          "published": "2023-01-12",
          "quote": "We're not able to share with you a specific cost gap number between Taiwan and U.S., but we can share with you that the major reason for the cost gap is the construction cost of building and facilities, which can be 4 to 5x greater for U.S. fab versus a fab in Taiwan."
        }
      ]
    },
    {
      "id": 26,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n26",
      "date": "2023-07-20",
      "date_precision": "day",
      "title": "TSMC pushes Arizona N4 production out to 2025, citing a shortage of skilled workers",
      "summary": "On its second-quarter 2023 earnings call, TSMC chairman Mark Liu said the Arizona fab lacked enough\nworkers with the expertise needed to install equipment, and that N4 production would be pushed from\n2024 to 2025. TSMC said it was sending experienced technicians from Taiwan to train local staff.",
      "type": "delay",
      "entities": [
        "TSMC",
        "Mark Liu"
      ],
      "published_at": "2026-09-02T09:41:03.027129+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.theregister.com/2023/07/20/tsmc_arizona_fab/",
          "outlet": "The Register",
          "published": "2023-07-21",
          "quote": "However, we are encountering certain challenges, as there is an insufficient amount of skilled workers with the specialized expertise required for equipment installation in a semiconductor grade facility."
        }
      ]
    },
    {
      "id": 35,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n35",
      "date": "2024-04",
      "date_precision": "month",
      "title": "First Arizona fab enters N4 engineering-wafer production",
      "summary": "TSMC said its first Arizona fab entered engineering-wafer production in April using N4 process technology. The statement concerned engineering-wafer production.",
      "type": "other",
      "entities": [
        "TSMC",
        "C.C. Wei",
        "TSMC Arizona",
        "N4"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "The transcript states that TSMC's first Arizona fab had entered engineering wafer production in April using N4 process technology. The quoted wording appears on the page and specifically concerns engineering-wafer production.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2024-04/34ff75e23e53246302ce3a8d90d0423c57c6b120/TSMC%201Q24%20Transcript.pdf",
          "outlet": "TSMC earnings-call transcript",
          "published": "2024-04-18",
          "quote": "We have made significant progress in our first fab, which has already entered engineering wafer production in April with the N4 process technology."
        }
      ]
    },
    {
      "id": 27,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n27",
      "date": "2024-04-08",
      "date_precision": "day",
      "title": "Up to US$6.6 billion in CHIPS Act funding; third fab planned; second fab moves to 2nm and 2028",
      "summary": "TSMC Arizona and the U.S. Department of Commerce announced a preliminary agreement for up to US$6.6\nbillion in direct CHIPS Act funding. TSMC added a third Phoenix fab for 2nm or more advanced processes by\nthe end of the decade, taking the site to more than US$65 billion. The first fab was described as on track\nfor 4nm production in the first half of 2025, and the second fab was now to produce 2nm as well as 3nm,\nwith production beginning in 2028 rather than 2026.",
      "type": "regulatory",
      "entities": [
        "TSMC",
        "U.S. Department of Commerce"
      ],
      "published_at": "2026-09-02T09:41:03.027177+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://pr.tsmc.com/english/news/3122",
          "outlet": "TSMC Newsroom",
          "published": "2024-04-08",
          "quote": "The third fab will produce chips using 2nm or more advanced processes, with production beginning by the end of the decade."
        }
      ]
    },
    {
      "id": 36,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n36",
      "date": "2024-10-23",
      "date_precision": "day",
      "title": "Report says Phoenix fab yield exceeds comparable Taiwan fabs",
      "summary": "Bloomberg reported that usable-chip yield at TSMC's Phoenix facility was about four percentage points higher than at comparable facilities in Taiwan. The report attributed the statement to TSMC US division president Rick Cassidy during a webinar.",
      "type": "report",
      "entities": [
        "TSMC",
        "Rick Cassidy",
        "TSMC Arizona",
        "Taiwan"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "The page states that usable-chip yield at TSMC’s Phoenix facility was about four percentage points higher than comparable Taiwan facilities, attributing the statement to US division president Rick Cassidy during a Wednesday webinar. The article supports the stated October 23, 2024 event date.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://news.bloomberglaw.com/mergers-and-acquisitions/tsmcs-arizona-chip-yields-surpass-taiwans-a-win-for-us-push",
          "outlet": "Bloomberg Law",
          "published": "2024-10-24",
          "quote": "The share of chips manufactured at TSMC’s facility in Phoenix that are usable is about 4 percentage points higher than comparable facilities in Taiwan, Rick Cassidy, president of TSMC’s US division, told listeners on a webinar Wednesday, according to a person who participated."
        }
      ]
    },
    {
      "id": 28,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n28",
      "date": "2024-12",
      "date_precision": "month",
      "title": "First Arizona fab enters volume production on N4",
      "summary": "TSMC has said its first Arizona fab has been in volume production since late 2024, on the N4 process, a\nfew months ahead of the first-half-2025 target set in April 2024. TSMC gives the timing as late 2024 or\nthe fourth quarter; no exact date has been published.",
      "type": "launch",
      "entities": [
        "TSMC"
      ],
      "published_at": "2026-09-02T09:41:03.027220+00:00",
      "note": "TSMC states only 'late 2024' / 4Q24; the month is the closest precision available.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://pr.tsmc.com/english/news/3210",
          "outlet": "TSMC Newsroom",
          "published": "2025-03-04",
          "quote": "The site has been in volume production since late 2024."
        }
      ]
    },
    {
      "id": 29,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n29",
      "date": "2025-03-04",
      "date_precision": "day",
      "title": "TSMC adds US$100 billion for three more fabs, two packaging plants and an R&D center: US$165 billion total",
      "summary": "Announced at the White House with President Trump, the expansion took TSMC's planned U.S. investment\nfrom US$65 billion to US$165 billion, covering three additional fabs, two advanced packaging facilities\nand a major R&D team center in Arizona.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "C.C. Wei",
        "Donald Trump"
      ],
      "published_at": "2026-09-02T09:41:03.027261+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://pr.tsmc.com/english/news/3210",
          "outlet": "TSMC Newsroom",
          "published": "2025-03-04",
          "quote": "The expansion includes plans for three new fabrication plants, two advanced packaging facilities and a major R&D team center."
        }
      ]
    },
    {
      "id": 38,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n38",
      "date": "2025-04-14",
      "date_precision": "day",
      "title": "NVIDIA says Blackwell chips start production at TSMC Phoenix plants",
      "summary": "NVIDIA announced that Blackwell chips had started production at TSMC chip plants in Phoenix, Arizona. The statement identified the production location as TSMC's Phoenix plants.",
      "type": "announcement",
      "entities": [
        "Nvidia",
        "TSMC",
        "TSMC Arizona",
        "Blackwell",
        "Amkor",
        "SPIL"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "NVIDIA blog post dated April 14, 2025 confirms the quote; date checked by the editor.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://blogs.nvidia.com/blog/nvidia-manufacture-american-made-ai-supercomputers-us/",
          "outlet": "NVIDIA Newsroom",
          "published": "2025-04-14",
          "quote": "NVIDIA Blackwell chips have started production at TSMC’s chip plants in Phoenix, Arizona."
        }
      ]
    },
    {
      "id": 39,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n39",
      "date": "2025-04-14",
      "date_precision": "day",
      "title": "AMD validates fifth-generation EPYC products at TSMC Arizona fab",
      "summary": "AMD announced successful bring-up and validation of its fifth-generation EPYC CPU products at TSMC's new Arizona fabrication facility. AMD said the result underscored its commitment to US manufacturing.",
      "type": "announcement",
      "entities": [
        "AMD",
        "TSMC",
        "TSMC Arizona",
        "Fab 21",
        "EPYC"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "The page states that AMD successfully brought up and validated its 5th Gen AMD EPYC CPU products at TSMC’s new Arizona fabrication facility, underscoring its commitment to U.S. manufacturing. It is dated April 14, 2025.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://ir.amd.com/news-events/press-releases/detail/1245/amd-achieves-first-tsmc-n2-product-silicon-milestone",
          "outlet": "AMD",
          "published": "2025-04-14",
          "quote": "AMD also announced the successful bring up and validation of its 5th Gen AMD EPYC™ CPU products at TSMC’s new fabrication facility in Arizona, underscoring its commitment to U.S. manufacturing."
        }
      ]
    },
    {
      "id": 40,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n40",
      "date": "2025-04-17",
      "date_precision": "day",
      "title": "TSMC says second Arizona fab construction is complete",
      "summary": "TSMC said construction of its second Arizona fab was already complete. It said the fab would use 3-nanometer process technologies and that the company was speeding up its volume-production schedule.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "TSMC Arizona",
        "Fab 2",
        "N3"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "Transcript dated April 17, 2025 supports the summary, quote and date.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2025-04/7630274eecc1197a4e3ea6a415f44a47204fe10a/TSMC%201Q25%20Transcript.pdf",
          "outlet": "TSMC earnings-call transcript",
          "published": "2025-04-17",
          "quote": "The construction of our second fab, which will utilize the 3-nanometer process technologies, is already complete, and we are working on speeding up the volume production schedule, based on the strong AI-related demand from our customers."
        }
      ]
    },
    {
      "id": 41,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n41",
      "date": "2025-04-17",
      "date_precision": "day",
      "title": "TSMC assigns N2 and A16 to its third and fourth Arizona fabs",
      "summary": "TSMC said its third and fourth Arizona fabs would use N2 and A16 process technologies. It said construction was scheduled to begin later in 2025, subject to receiving permits.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "TSMC Arizona",
        "Fab 3",
        "Fab 4",
        "N2",
        "A16"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "The transcript is readable and identifies the earnings call event date as April 17, 2025. It states that the third and fourth Arizona fabs will utilize N2 and A16 and, subject to necessary permits, are scheduled to begin construction later in 2025.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2025-04/7630274eecc1197a4e3ea6a415f44a47204fe10a/TSMC%201Q25%20Transcript.pdf",
          "outlet": "TSMC earnings-call transcript",
          "published": "2025-04-17",
          "quote": "Our third and fourth fab will utilize N2 and A16 process technologies, and with the expectation of receiving all the necessary permits, is scheduled to begin construction later this year."
        }
      ]
    },
    {
      "id": 37,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n37",
      "date": "2025-04-29",
      "date_precision": "day",
      "title": "TSMC breaks ground on its third Arizona fab, slated for N2 and A16",
      "summary": "TSMC broke ground on its third Phoenix fab on April 29, 2025, with Commerce Secretary Howard Lutnick attending. TSMC's Arizona site page says the fab is slated for N2 and A16 process technologies.",
      "type": "other",
      "entities": [
        "TSMC",
        "Howard Lutnick",
        "U.S. Department of Commerce"
      ],
      "published_at": "2026-09-02T09:48:28.011744+00:00",
      "note": "Date and attendance from the Commerce Department release; process nodes from TSMC's Arizona page.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.tsmc.com/static/abouttsmcaz/index.htm",
          "outlet": "TSMC Arizona",
          "published": null,
          "quote": "In April 2025, TSMC broke ground on the site of the third fab, slated for N2 and A16 process technologies."
        },
        {
          "url": "https://www.commerce.gov/news/press-releases/2025/04/commerce-secretary-howard-lutnick-visits-tsmc-arizona-fabrication",
          "outlet": "U.S. Department of Commerce",
          "published": "2025-04-29",
          "quote": "Today, U.S. Secretary of Commerce Howard Lutnick visited the Taiwan Semiconductor Manufacturing Company (TSMC) semiconductor fabrication facility in Phoenix, Arizona where the company broke ground on a third fab facility."
        }
      ]
    },
    {
      "id": 30,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n30",
      "date": "2025-07-17",
      "date_precision": "day",
      "title": "Second fab construction complete, production pulled forward; 30% of 2nm-and-beyond capacity to be in Arizona",
      "summary": "On the second-quarter 2025 call, CEO C.C. Wei said construction of the second Arizona fab, for 3nm, was\ncomplete and its volume production schedule was being sped up by several quarters. Work on the third fab,\nfor 2nm and A16, had begun. Wei said about 30 percent of TSMC's 2nm-and-smaller capacity would eventually\nbe in Arizona.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "C.C. Wei",
        "Nvidia",
        "Apple",
        "AMD"
      ],
      "published_at": "2026-09-02T09:41:03.027302+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.theregister.com/2025/07/17/tsmc_q2_ramp/",
          "outlet": "The Register",
          "published": "2025-07-17",
          "quote": "speeding up the volume production schedule by several quarters to support their need."
        }
      ]
    },
    {
      "id": 31,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n31",
      "date": "2026-01-15",
      "date_precision": "day",
      "title": "TSMC says it is pulling forward Arizona fab schedules toward an independent gigafab cluster",
      "summary": "On the fourth-quarter 2025 call, TSMC said it was pulling forward existing fab schedules in Taiwan and\nArizona, that Arizona yields and defect density were almost equal to Taiwan, and that the plan would scale\nan independent gigafab cluster in Arizona with around 30 percent of 2nm-and-more-advanced capacity.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "C.C. Wei"
      ],
      "published_at": "2026-09-02T09:41:03.027340+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2026-01/51d09df96cd89ac19d65af39032b038dc2896a24/TSMC%204Q25%20Transcript.pdf",
          "outlet": "TSMC 4Q25 earnings call transcript",
          "published": "2026-01-15",
          "quote": "We are also pulling forward the existing fab schedules to the extent possible, both in Taiwan and in Arizona."
        }
      ]
    },
    {
      "id": 657,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n657",
      "date": "2026-02-24",
      "date_precision": "day",
      "title": "Apple plans to buy over 100 million TSMC Arizona chips in 2026",
      "summary": "Apple said it was on track to purchase well over 100 million advanced chips produced by TSMC at its Arizona facility in 2026. Apple said this would be an increase from 2025.",
      "type": "announcement",
      "entities": [
        "Apple",
        "TSMC",
        "TSMC Arizona"
      ],
      "published_at": "2026-09-08T02:44:51.524940+00:00",
      "note": "The Apple Newsroom page is readable and states that Apple is on track to purchase well over 100 million advanced TSMC Arizona chips in 2026, a significant increase from 2025. The page is dated February 24, 2026.",
      "image": "/images/nodes/tsmc-arizona-fabs/657-62a85e7c.jpg",
      "image_credit": {
        "credit": "Apple, press image",
        "source_url": "https://www.apple.com/newsroom/2026/02/apple-accelerates-us-manufacturing-with-mac-mini-production/",
        "image_url": "https://www.apple.com/newsroom/images/2026/02/apple-accelerates-us-manufacturing-with-mac-mini-production/tile/Apple-US-manufacturing-investment-Houston-hero-lp.jpg.og.jpg?202608191701",
        "terms_url": "https://www.apple.com/legal/internet-services/terms/site.html",
        "width": 1200,
        "height": 630,
        "mode": "editorial"
      },
      "sources": [
        {
          "url": "https://www.apple.com/newsroom/2026/02/apple-accelerates-us-manufacturing-with-mac-mini-production/",
          "outlet": "Apple",
          "published": "2026-02-24",
          "quote": "In 2026, Apple is on track to purchase well over 100 million advanced chips produced by TSMC at its Arizona facility — a significant increase from 2025."
        }
      ]
    },
    {
      "id": 658,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n658",
      "date": "2026-03",
      "date_precision": "month",
      "title": "TSMC says all advanced packaging remains in Taiwan",
      "summary": "TSMC told EE Times that all of its advanced packaging was in Taiwan. TSMC planned two advanced-packaging facilities at its Arizona site.",
      "type": "response",
      "entities": [
        "TSMC",
        "TSMC Arizona"
      ],
      "published_at": "2026-09-08T02:44:51.524940+00:00",
      "note": "The EE Times article states that a TSMC spokesperson said all of its advanced packaging is currently in Taiwan and that two advanced-packaging facilities are planned at TSMC Arizona. It is dated 2026-03-06, which matches the node's March 2026 date.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.eetimes.com/apples-first-made-in-u-s-chips-fall-short-of-claim/",
          "outlet": "EE Times",
          "published": "2026-03-06",
          "quote": "Currently, all of TSMC’s advanced packaging is in Taiwan."
        }
      ]
    },
    {
      "id": 659,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n659",
      "date": "2026-04",
      "date_precision": "month",
      "title": "Initial construction starts on fourth Arizona fab and packaging plant",
      "summary": "TSMC started initial construction on its fourth Arizona fab and first advanced-packaging plant. The City of Phoenix reported that TSMC announced the start during the preceding month.",
      "type": "other",
      "entities": [
        "TSMC",
        "TSMC Arizona",
        "City of Phoenix"
      ],
      "published_at": "2026-09-08T02:44:51.524940+00:00",
      "note": "The page dated May 5, 2026 states that TSMC announced initial construction on the fourth fab and first advanced-packaging plant \"just last month,\" supporting an April 2026 event date. It also describes the facilities as the fourth fab and first advanced packaging plant.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.phoenix.gov/newsroom/mayors-office-news/mayor-gallego-celebrates-tsmc-s-fab-3-at-topping-out-ceremony.html",
          "outlet": "City of Phoenix",
          "published": "2026-05-05",
          "quote": "Just last month, TSMCannounced that initial construction had started on the fourth fab and the first advanced packaging plant which is a key supply chain cog."
        },
        {
          "url": "https://www.tsmc.com/static/abouttsmcaz/index.htm",
          "outlet": "TSMC Arizona",
          "published": null,
          "quote": "Fourth Fab and First Advanced Packaging Fab: In early 2026, the company started initial stages of construction."
        }
      ]
    },
    {
      "id": 660,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n660",
      "date": "2026-05-05",
      "date_precision": "day",
      "title": "TSMC Arizona holds Fab 3 topping-out ceremony",
      "summary": "TSMC Arizona held a topping-out ceremony for Fab 3 with Phoenix Mayor Kate Gallego and TSMC Arizona executives. TSMC Arizona said it celebrated the topping of its third fab in May.",
      "type": "other",
      "entities": [
        "TSMC",
        "TSMC Arizona",
        "Fab 3",
        "City of Phoenix",
        "Kate Gallego"
      ],
      "published_at": "2026-09-08T02:44:51.524940+00:00",
      "note": "The page is readable and dated May 05, 2026. It states that Mayor Kate Gallego and TSMC Arizona executives participated in the Fab 3 topping-out ceremony, and it says May marks the relevant TSMC milestone.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.phoenix.gov/newsroom/mayors-office-news/mayor-gallego-celebrates-tsmc-s-fab-3-at-topping-out-ceremony.html",
          "outlet": "City of Phoenix",
          "published": "2026-05-05",
          "quote": "Today, Mayor Kate Gallego and Taiwan Semiconductor Manufacturing Company Arizona executives participated in the “Topping Out Ceremony” for the third semiconductor manufacturing facility known as ‘Fab 3’."
        },
        {
          "url": "https://www.tsmc.com/static/abouttsmcaz/news.htm",
          "outlet": "TSMC Arizona",
          "published": "2026-06",
          "quote": "TSMC Arizona celebrated the topping of our third fab in May."
        }
      ]
    },
    {
      "id": 661,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n661",
      "date": "2026-05-12",
      "date_precision": "day",
      "title": "TSMC board approves up to US$20 billion for TSMC Arizona",
      "summary": "TSMC's board approved a capital injection of no more than US$20 billion into TSMC Arizona. The authorization was disclosed in a Form 6-K filing with the U.S. Securities and Exchange Commission.",
      "type": "financial",
      "entities": [
        "TSMC",
        "TSMC Arizona",
        "U.S. Securities and Exchange Commission"
      ],
      "published_at": "2026-09-08T02:44:51.524940+00:00",
      "note": "The Form 6-K states that TSMC's board approved a capital injection of not more than US$20 billion to TSMC Arizona, a wholly owned subsidiary. The filing and the board resolutions are dated May 12, 2026.",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1046179/000104617926000274/tsm-boardx20260512.htm",
          "outlet": "TSMC Form 6-K / U.S. Securities and Exchange Commission",
          "published": "2026-05-12",
          "quote": "Approved the capital injection of not more than US$20 billion to TSMC Arizona, a wholly-owned subsidiary of TSMC."
        }
      ]
    },
    {
      "id": 32,
      "url": "https://whatledto.com/events/tsmc-arizona-fabs#n32",
      "date": "2026-07-16",
      "date_precision": "day",
      "title": "Another US$100 billion for Arizona: total reaches US$265 billion for more 2nm fabs and packaging",
      "summary": "Alongside second-quarter 2026 results, chairman C.C. Wei said TSMC would invest an additional US$100\nbillion in Arizona to build several more wafer fabs for 2-nanometer and below technologies plus advanced\npackaging fabs, bringing the state total to US$265 billion. Wei said there was a plan but no firm schedule\nfor the new sites.",
      "type": "announcement",
      "entities": [
        "TSMC",
        "C.C. Wei"
      ],
      "published_at": "2026-09-02T09:41:03.027378+00:00",
      "note": "",
      "image": "",
      "image_credit": {
        "credit": "",
        "source_url": "",
        "image_url": "",
        "terms_url": "",
        "mode": "licensed"
      },
      "sources": [
        {
          "url": "https://www.cnbc.com/2026/07/16/tsmc-second-quarter-profit-.html",
          "outlet": "CNBC",
          "published": "2026-07-16",
          "quote": "TSMC will invest an additional $100 billion in Arizona to meet strong customer demand, bringing its total investment in the state to $265 billion, Wei added."
        },
        {
          "url": "https://investor.tsmc.com/schinese/encrypt/files/encrypt_file/reports/2026-08/3e494f0c14dd0890f897aa044415e21d93486cc4/TSMC%202Q26%20Transcript.pdf",
          "outlet": "TSMC earnings conference transcript / LSEG StreetEvents",
          "published": "2026-07-16",
          "quote": "The schedule will depend on the market situation, you know that."
        }
      ]
    }
  ],
  "relations": [
    {
      "from": 24,
      "to": 26,
      "kind": "contradicts",
      "note": "The 2020 plan targeted production in 2024; in July 2023 TSMC moved it to 2025."
    },
    {
      "from": 25,
      "to": 27,
      "kind": "contradicts",
      "note": "The second fab was scheduled for 3nm in 2026 in December 2022; by April 2024 it was 2nm and 3nm in 2028."
    },
    {
      "from": 26,
      "to": 28,
      "kind": "follows",
      "note": "After the labor-shortage delay, volume production began in late 2024, inside the revised 2025 window."
    },
    {
      "from": 27,
      "to": 30,
      "kind": "follows",
      "note": "The 2028 second-fab date was later pulled forward by several quarters once construction finished."
    },
    {
      "from": 29,
      "to": 32,
      "kind": "follows",
      "note": "Sixteen months after the US$165 billion plan, TSMC added another US$100 billion."
    },
    {
      "from": 30,
      "to": 31,
      "kind": "follows",
      "note": "The acceleration announced in July 2025 was reiterated in January 2026 as a site-wide pull-forward."
    },
    {
      "from": 26,
      "to": 35,
      "kind": "follows",
      "note": "TSMC's April 2024 engineering-wafer milestone followed its July 2023 announcement that Arizona N4 production would move to 2025."
    },
    {
      "from": 35,
      "to": 36,
      "kind": "follows",
      "note": "The October 2024 reported yield comparison concerned early production at the first Phoenix fab after its April 2024 engineering-wafer milestone."
    },
    {
      "from": 35,
      "to": 38,
      "kind": "follows",
      "note": "NVIDIA's April 2025 announcement of Blackwell production at TSMC Phoenix followed the first fab's April 2024 N4 engineering-wafer production."
    },
    {
      "from": 35,
      "to": 39,
      "kind": "follows",
      "note": "AMD's April 2025 validation announcement followed the first Arizona fab's April 2024 N4 engineering-wafer milestone."
    },
    {
      "from": 40,
      "to": 30,
      "kind": "contradicts",
      "note": "TSMC said on April 17, 2025 that second-fab construction was already complete, whereas the July 17 timeline entry describes the second fab as construction-complete."
    },
    {
      "from": 37,
      "to": 41,
      "kind": "contradicts",
      "note": "TSMC's Arizona page says the third-fab site broke ground in April 2025, while its April 17 call said third- and fourth-fab construction was scheduled to begin later in 2025."
    }
  ],
  "links": [],
  "key_node_ids": [
    24,
    25,
    26,
    27,
    28,
    29,
    30,
    31,
    32
  ],
  "catalysts": [
    {
      "date": "2029-12",
      "title": "Third Arizona fab targeted for production by the end of the decade",
      "why": "TSMC’s April 2024 plan put third-fab production by the end of the 2020s; later statements changed its assigned technologies but did not give a replacement production date.",
      "source_url": "https://pr.tsmc.com/english/news/3122"
    }
  ],
  "open_questions": [
    "What is the final volume-production date for Fab 2? TSMC originally described 3nm-and-2nm production beginning in 2028, then said the 3nm fab’s schedule was being accelerated by several quarters without naming a new date.",
    "What will be the final process assignment for Fab 2? The December 2022 plan called for 3nm in 2026, while the April 2024 plan described 2nm as well as 3nm in 2028; later statements refer to Fab 2 as a 3nm fab.",
    "When will the third fab enter production? Its original end-of-decade target remains the only stated production timing despite later assignment of N2 and A16 technologies and construction progress.",
    "What are the locations and schedules for the several additional fabs and packaging facilities in the US$100 billion expansion announced in July 2026? TSMC said it had a plan but no firm schedule.",
    "When will advanced packaging begin operating in Arizona? TSMC planned Arizona packaging facilities, but said in March 2026 that all advanced packaging remained in Taiwan; initial construction began afterward."
  ],
  "metrics": [
    {
      "key": "investment",
      "name": "TSMC's announced Arizona investment",
      "unit": "$B",
      "kind": "step",
      "points": [
        {
          "node_id": 24,
          "date": "2020-05-15",
          "value": 12,
          "quote": "about US$12 billion of spending from 2021 to 2029"
        },
        {
          "node_id": 33,
          "date": "2021-06-01",
          "value": 12,
          "quote": "The company planned to spend US$12 billion on the facility."
        },
        {
          "node_id": 25,
          "date": "2022-12-06",
          "value": 40,
          "quote": "The two fabs together were put at about US$40 billion."
        },
        {
          "node_id": 27,
          "date": "2024-04-08",
          "value": 65,
          "quote": "taking the site to more than US$65 billion."
        },
        {
          "node_id": 29,
          "date": "2025-03-04",
          "value": 165,
          "quote": "the expansion took TSMC's planned U.S. investment from US$65 billion to US$165 billion"
        },
        {
          "node_id": 32,
          "date": "2026-07-16",
          "value": 265,
          "quote": "bringing the state total to US$265 billion"
        }
      ]
    }
  ],
  "related": [
    {
      "slug": "intel-foundry-18a",
      "url": "https://whatledto.com/events/intel-foundry-18a",
      "json": "https://whatledto.com/events/intel-foundry-18a.json"
    },
    {
      "slug": "nvidia-datacenter-gpu-roadmap",
      "url": "https://whatledto.com/events/nvidia-datacenter-gpu-roadmap",
      "json": "https://whatledto.com/events/nvidia-datacenter-gpu-roadmap.json"
    }
  ],
  "changelog": [
    {
      "date": "2026-09-08T02:45:22.530202+00:00",
      "kind": "summary",
      "summary": "Chart data refreshed: 6 point(s) across 1 metric(s).",
      "node_ids": []
    },
    {
      "date": "2026-09-08T02:45:22.530198+00:00",
      "kind": "summary",
      "summary": "Summary, key players and catalysts refreshed.",
      "node_ids": []
    },
    {
      "date": "2026-09-08T02:44:51.569648+00:00",
      "kind": "publish",
      "summary": "Added 5 node(s): 2026-02-24 Apple plans to buy over 100 million TSMC Arizona chips in 2026; 2026-03 TSMC says all advanced packaging remains in Taiwan; 2026-04 Initial construction starts on fourth Arizona fab and packaging plant; 2026-05-05 TSMC Arizona holds Fab 3 topping-out ceremony and 1 more.",
      "node_ids": [
        657,
        658,
        659,
        660,
        661
      ]
    },
    {
      "date": "2026-09-08T02:44:12.836099+00:00",
      "kind": "research",
      "summary": "Research run found 6 candidate node(s).",
      "node_ids": [
        657,
        658,
        659,
        660,
        661,
        662
      ]
    },
    {
      "date": "2026-09-07T06:15:28.779251+00:00",
      "kind": "summary",
      "summary": "Chart data refreshed: 6 point(s) across 1 metric(s).",
      "node_ids": []
    },
    {
      "date": "2026-09-07T05:32:21.665871+00:00",
      "kind": "summary",
      "summary": "Summary, key players and catalysts refreshed.",
      "node_ids": []
    },
    {
      "date": "2026-09-02T09:48:53.851004+00:00",
      "kind": "summary",
      "summary": "Summary, key players and catalysts refreshed.",
      "node_ids": []
    },
    {
      "date": "2026-09-02T09:48:28.017729+00:00",
      "kind": "publish",
      "summary": "Added 9 node(s): 2021-06-01 TSMC begins construction at its Arizona fab site; 2023-01-12 TSMC says US fab construction costs can be four to five times Taiwan's; 2024-04 First Arizona fab enters N4 engineering-wafer production; 2024-10-23 Report says Phoenix fab yield exceeds comparable Taiwan fabs and 5 more.",
      "node_ids": [
        33,
        34,
        35,
        36,
        38,
        39,
        40,
        41,
        37
      ]
    },
    {
      "date": "2026-09-02T09:47:25.833175+00:00",
      "kind": "research",
      "summary": "Research run found 9 candidate node(s).",
      "node_ids": [
        33,
        34,
        35,
        36,
        37,
        38,
        39,
        40,
        41
      ]
    },
    {
      "date": "2026-09-02T09:41:03.035466+00:00",
      "kind": "seed",
      "summary": "Seeded 9 hand-verified node(s) from tsmc-arizona-fabs.yaml.",
      "node_ids": [
        24,
        25,
        26,
        27,
        28,
        29,
        30,
        31,
        32
      ]
    }
  ],
  "license": {
    "holder": "What Led To",
    "terms": "https://whatledto.com/methodology#reuse",
    "summary": "Quote entries with attribution and a link to the entry; do not republish whole timelines or train models on the text."
  }
}
